ENERCON FEECP EOI

 

Viewing In : Rawalpindi/Islamabad > Services > Automotive

Summary:
Go to Full Ad


   Related Ads
Fuel Efficient Device www.enercon.gov.pk



   Across Pakistan
ENERCON FEECP EOI
ENERCON FEECP EOI



Share |
Subscribe to receive similar ads by email

Date : 2009-10-19

ENERCON FEECP EOI



Price:

Description :

ENERCON FEECP EOI

Expression of Interest

Fuel Efficiency and Emission Control Program

ENERCON is about to launch Fuel Efficiency and Emission Control Program (FEECP)  through a solution based, fully out sourced private and Public Partnership mode. Fuel Efficiency and Emission Control in the Transport Sector, would ensure the following services.

Safety inspection will include:-

Vehicular Tune Up Inspection:-

//////////////////////////////////////////////////////////////////////

a. Engine Tune UP system

EFI System, Air & Fuel Filters, Spark Plugs & Injectors etc.

b. Exhaust Emission Test

CO, HC, NOx etc.

c. Fuel Efficiency Conversions

Diesel / CNG / LPG Conversions:

a.   Cylinder pressure Tests

b.   b. Safety Valves Test

c.   Pip & Joints Test etc.

 

d.   Under Body Inspection:

Steering, Suspension, Engine Frame, Body,  Brakes, Exhaust Emission Controls, Electrical System, etc.

////////////////////////////////////////////////////////////////////////

///////////////////////////////////////////////////////////////////////

///////////////////////////////////////////////////////////////////////

/////////////////////////////////////////////////////////////

///////////////////////////////////////////////

e.   ABS test:-

Brake Inspection, Brake Force, Wheel Alignment, Side Slip Inspection

/////////////////////////////////////////////////////////////////////

/////////////////////////////////////////////////////////////

////////////////////////////////////////////////////////

/////////////////////////////////////////////

 

Successful Parties/Firms/OMCs would be fully mandated from the Government of Pakistan to install and operate the program. They would be responsible for making available the premises preferably at the Gas Stations with adequate Space.

Terms & Conditions:

  1. The firms should possess adequate space for all above inspection.
  2. Proven & verifiable financial stability of the firms is a pre-requisite.
  3. The firms should have 3-5 years experience.
  4. ENERCON reserves all rights of Evaluation/Acceptance at any stage.
  5. The firms should submit financial statement, technical capability, location, capacity and space availability along with the expression of interest (EOI) with 15 days of the publication.

Asif Masood

Chief Technical Officer

Energy Conservation Fund

ENERCON Building Opposite State Bank of Pakistan

G-5/2, Islamabad

Ph: 051-2272649, Fax: 051-2273870.



Contact : 051-2272649,
Share |

  Rawalpindi/Islamabad |  Lahore |  Karachi |  Peshawar |  Multan |  Quetta |  Gujranwala/Gujrat/Wazirabad |  Faisalabad |  Hyderabad/Sukkur |  Sialkot |  Campus
Privacy Policy | Disclaimer
All rights reserved 2009 PE&ITS (Pvt.) Ltd. Pakistan.




     Classified ads for Pakistan